Maintenance of the UPS system/diesel generators - Wartung der UPS-System/Diesel Generatoren
Scheduled Maintenance Report for plusserver
Completed
The scheduled maintenance has been completed.
Posted May 14, 2024 - 20:00 CEST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 13, 2024 - 08:00 CEST
Scheduled
Dear customers, 
Please note the following maintenance announcement from Equinix.

--

DATE: 13-MAY-2024 - 14-MAY-2024
SPAN: 13-MAY-2024 - 14-MAY-2024
LOCAL: MONDAY, 13 MAY 08:00 - MONDAY, 13 MAY 20:00
UTC: MONDAY, 13 MAY 06:00 - MONDAY, 13 MAY 18:00
LOCAL: TUESDAY, 14 MAY 08:00 - TUESDAY, 14 MAY 20:00
UTC: TUESDAY, 14 MAY 06:00 - TUESDAY, 14 MAY 18:00

SERVICE IMPACT:
• Power
• Loads will remain on utility power
• UPS loads will be transferred to an alternate UPS protected source
• System redundancy will be reduced
• Cooling
• System redundancy will be maintained

DESCRIPTION: Annually Preventive Maintenance UPS-System Diesel Generator

We would like to inform you that we will be performing the scheduled Annually Preventive Maintenance UPS-System the Diesel Generator included generator test (power failure test) Transformer, Busbar, Switchgear on the date mentioned above.

Equinix engineers will work closely on-site with equipment system vendors and service providers to ensure that the maintenance is non-intrusive.

During the Maintenance the (backup) catcher System will not be available but all customer loads will still be supplied by all power feeds.

The maintenance and UPS load test will NOT be performed simultaneously.
The redundancy (feed A/B) will be available during this period.

The equipment being maintained supports your circuits indicated in the table:

Impacted Assets

Account #Cage #Cabinet #Serial #Circuit Type
100295M4S40201024413416Redundant
100295M4S40202147155534Redundant
100295M4S40202034413424Redundant
100295M4S40201144413390Redundant
100295M4S40202044413426Redundant
100295M4S40202147155531Primary
100295M4S40202137155532Primary
100295M4S40201034413323Primary
100295M4S40201084413330Primary
100295M4S40202014413352Primary
100295M4S40201054413327Primary
100295M4S40201104413347Primary
100295M4S40201144413351Primary
100295M4S40202094413372Primary
100295M4S40202114413380Primary
100295M4S40201054413402Redundant
100295M4S40202094413419Redundant
100295M4S4020101239001.102Redundant
100295M4S40201034413412Redundant
100295M4S40202074413421Redundant
100295M4S40202014413388Redundant
100295M4S40201124413394Redundant
100295M4S40201094413398Redundant
100295M4S40201074413400Redundant
100295M4S40202114413417Redundant
100295M4S40202034413365Primary
100295M4S40201014413321Primary
100295M4S40201134413350Primary
100295M4S40202054413368Primary
100295M4S40201124413349Primary
100295M4S40202074413370Primary
100295M4S40202024413386Redundant
100295M4S40201104413397Redundant
100295M4S40202127155530Primary
100295M4S40202137155535Redundant
100295M4S4020101239001.101Primary
100295M4S40202054413423Redundant
100295M4S40202127155533Redundant
100295M4S402010713285871Redundant
100295M4S40201044413325Primary
100295M4S40201094413343Primary
100295M4S40202024413362Primary
100295M4S40202084413371Primary
100295M4S40201064413328Primary
100295M4S40201114413348Primary
100295M4S40202104413377Primary
100295M4S40201014413385Redundant
100295M4S40201134413393Redundant
100295M4S40201084413399Redundant
100295M4S402010713285870Primary
100295M4S40201114413395Redundant
100295M4S40201064413401Redundant
100295M4S40202104413418Redundant
100295M4S402-4413274_MPH-
100295M4S40201044413406Redundant
100295M4S40202084413420Redundant
100295M4S40202064413422Redundant
100295M4S402-4413427_MPH-
100295M4S40201024413322Primary
100295M4S40202064413369Primary
100295M4S40201074413329Primary
100295M4S40202044413366Primary

During this period, all services (Smart Hands, installations, work visits, etc.) will continue in accordance with our normal procedures.
--

Sehr geehrte Kunden, 
bitte beachten Sie nachfolgende Wartungsankündigung von Equinix.
--

DATUM: 13-MAI-2024 - 14-MAI-2024
ZEITRAUM: 13-MAI-2024 - 14-MAI-2024
LOKAL: MONTAG, 13 MAI 08:00 - MONTAG, 13 MAI 20:00
UTC: MONTAG, 13 MAI 06:00 - MONTAG, 13 MAI 18:00
LOKAL: DIENSTAG, 14 MAI 08:00 - DIENSTAG, 14 MAI 20:00
UTC: DIENSTAG, 14 MAI 06:00 - DIENSTAG, 14 MAI 18:00

AUSWIRKUNG AUF DEN SERVICE:
• Strom
• Die Lasten bleiben mit dem Netzstrom versorgt
• Die USV-Lasten werden auf eine alternative USV-geschützte Quelle übertragen
• Die Systemredundanz wird reduziert
• Kühlung
• Die Systemredundanz wird aufrechterhalten

BESCHREIBUNG: Jährliche Wartung der USV-Systeme Diesel Generator
Hiermit möchten wir Sie informieren, dass wir die jährliche Wartung der UPS-System/Diesel Generatoren sowie den turnusmäßigen Generatoren-Lasttest (Netzausfalltests), Transformator, Stromschiene, Schaltanlage an dem o.a. Termin durchführen werden.

Die Equinix Ingenieure werden vor Ort eng mit den Lieferanten und Dienstleistern zusammenarbeiten, um sicherzustellen, dass die Wartung störungsfrei abläuft.

Während der Wartung wird die Ersatzanlage (Catcher) nicht zur Verfügung stehen, jedoch werden alle Kundenlasten weiterhin mit allen Strompfaden versorgt.

Die Wartung und der USV Test werden nicht gleichzeitig durchgeführt.
Die Redundanz (Feed A/B) bleibt während dieser Zeit erhalten.

Während dieses Zeitraums werden alle Dienstleistungen (Smart Hands, Installationen, Arbeitsbesuche usw.) gemäß unseren normalen Verfahren fortgesetzt.
Posted Apr 08, 2024 - 10:28 CEST