Security vulnerability in Java/OpenJDK - Sicherheitslücke in Java/OpenJDK (CVE-2026-114938)
Subscribe
Identified - We are aware of a critical security vulnerability (CVE-2026-114938, CVSS 8.1) in the compiler component of Java SE / OpenJDK. The vulnerability can be exploited by unauthenticated attackers via the network when applications process data through the affected APIs (e.g. via web services). Successful exploitation may lead to a full compromise of the Java environment. Exploitation is considered difficult.
OpenJDK versions 17, 21, 25 and 27 are affected. At this time, no security update is available from the distributions yet.
As soon as a fix is released, we will initiate the JDK update. Please note: we will only patch systems of customers with Full Management or Operations with the Patchup package. Customers without one of these contracts are asked to apply the update themselves once it becomes available.
We will provide further updates here.
--
Wir haben Kenntnis von einer kritischen Sicherheitslücke (CVE-2026-114938, CVSS 8.1) im Compiler-Bestandteil von Java SE / OpenJDK. Die Lücke kann von nicht authentifizierten Angreifern über das Netzwerk ausgenutzt werden, wenn Anwendungen Daten über die betroffenen APIs verarbeiten (z. B. über Webservices). Eine erfolgreiche Ausnutzung kann zur vollständigen Kompromittierung der Java-Umgebung führen. Die Ausnutzung gilt als technisch anspruchsvoll.
Betroffen sind die OpenJDK-Versionen 17, 21, 25 und 27. Derzeit steht seitens der Distributionen noch kein Sicherheitsupdate zur Verfügung.
Sobald ein Fix veröffentlicht ist, werden wir die Aktualisierung des JDK einleiten. Bitte beachten Sie: Wir patchen ausschließlich Systeme von Kunden mit Full-Management sowie Operations mit Patchup-Paket. Kunden ohne einen dieser Verträge bitten wir, das Update eigenständig einzuspielen, sobald es verfügbar ist.
Wir informieren Sie an dieser Stelle über den weiteren Verlauf.
Nov 18, 2026 - 11:56 CET
OpenJDK versions 17, 21, 25 and 27 are affected. At this time, no security update is available from the distributions yet.
As soon as a fix is released, we will initiate the JDK update. Please note: we will only patch systems of customers with Full Management or Operations with the Patchup package. Customers without one of these contracts are asked to apply the update themselves once it becomes available.
We will provide further updates here.
--
Wir haben Kenntnis von einer kritischen Sicherheitslücke (CVE-2026-114938, CVSS 8.1) im Compiler-Bestandteil von Java SE / OpenJDK. Die Lücke kann von nicht authentifizierten Angreifern über das Netzwerk ausgenutzt werden, wenn Anwendungen Daten über die betroffenen APIs verarbeiten (z. B. über Webservices). Eine erfolgreiche Ausnutzung kann zur vollständigen Kompromittierung der Java-Umgebung führen. Die Ausnutzung gilt als technisch anspruchsvoll.
Betroffen sind die OpenJDK-Versionen 17, 21, 25 und 27. Derzeit steht seitens der Distributionen noch kein Sicherheitsupdate zur Verfügung.
Sobald ein Fix veröffentlicht ist, werden wir die Aktualisierung des JDK einleiten. Bitte beachten Sie: Wir patchen ausschließlich Systeme von Kunden mit Full-Management sowie Operations mit Patchup-Paket. Kunden ohne einen dieser Verträge bitten wir, das Update eigenständig einzuspielen, sobald es verfügbar ist.
Wir informieren Sie an dieser Stelle über den weiteren Verlauf.
Nov 18, 2026 - 11:56 CET
General
Operational
Sites
Operational
CGN DataCore [DE-WEST-1]
Operational
CGN1
Operational
DUS4
Operational
DUS6.1 DataHub [DE-WEST-2]
Operational
DUS6.2 DataHub [DE-WEST-2]
Operational
FRA3
Operational
FRA4
Operational
HAM1
Operational
HAM5.1 DataBase [DE-NORTH-1]
Operational
HAM5.2 DataBase [DE-NORTH-1]
Operational
HAM6 DataStore [DE-NORTH-2]
Operational
pluscloud VMware Region DE-1 [DE-NORTH-1]
Operational
pluscloud VMware Region DE-2 [DE-NORTH-2]
Operational
pluscloud VMware Region DE-3 [DE-WEST-1]
Operational
pluscloud VMware Region DE-4 [DE-WEST-2]
Operational
pluscloud VMware Region DE-5 [DE-NORTH-1]
Operational
pluscloud VMware Region DE-6 [DE-NORTH-2]
Operational
pluscloud VMware Region DE-7 [DE-WEST-1]
Operational
pluscloud VMware Region DE-9 [DE-WEST-2]
Operational
pluscloud VMware Region DE-11 [DE-WEST-1]
Operational
pluscloud VMware Region FR-1
Operational
pluscloud open Region prod1 [DE-WEST-1]
Operational
pluscloud open Region prod2 [DE-NORTH-1]
Operational
pluscloud open Region prod3 [DE-NORTH-2]
Operational
pluscloud open Region prod4 [DE-WEST-2]
Operational
plusserver Kubernetes Engine Region prod1 [DE-WEST-1]
Operational
plusserver Kubernetes Engine Region prod2 [DE-NORTH-1]
Operational
plusserver Kubernetes Engine Region prod3 [DE-NORTH-2]
Operational
plusserver Kubernetes Engine Region prod4 [DE-WEST-2]
Operational
Services
Operational
Akamai Control Center
Operational
Akamai Enterprise Application Access (EAA)
Operational
API Domain Service Provider (DSP)
Operational
Backup
Operational
Climatic
Operational
CloudHub
Operational
Confluence / plusserver-Wiki / Extranet
Operational
DNS
Operational
ESET EDR as a service
Operational
ESET FileSecurity
Operational
ESET Protect
Operational
Mail
Operational
Monitoring
Operational
Network
Operational
pluscloud open
Operational
pluscloud VMware
Operational
plusserver Kubernetes Engine
Operational
plusserver CloudHub
Operational
plusserver support
Operational
plusstorage
Operational
Power
Operational
RedHat Satellite Server
Operational
Virtual Business Firewall
Operational
SXB DataDock (inactive)
Under Maintenance
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Scheduled Maintenance
Upgrade new product version - Upgrade neue Produkt Version Nov 19, 2026 11:00 - Nov 21, 2026 11:00 CET
Dear Customers,
We would like to inform you about upcoming maintenance work in the Kubernetes environment. The work includes an upgrade to a newer product version to improve stability and fix various bugs.
Date: Thursday, November 19, 2026 -starting at 11:00 a.m. (CET) through Saturday, November 21, 2026 -ending around 11:00 a.m. (CET)
Reference Ticket: MK-3725
Changelog: Upgraded Gardener from v1.151.4 to v1.152.3
Impact: During the maintenance window, the API interface will be unavailable for up to one minute.
The necessary maintenance work is intended to ensure the security, up-to-date status, and performance of our infrastructure. We are committed to completing it as quickly as possible with minimal impact on your systems.
If you have any further questions regarding this process, please feel free to contact us through your usual channels.
Thank you for your understanding.
--
Sehr geehrte Kunden,
hiermit möchten wir Sie über anstehende Wartungsarbeiten in der Kubernetes Umgebung informieren. Die Arbeiten umfassen ein Upgrade auf eine neuere Produktversion zur Steigerung der Stabilität sowie Beseitigung diverser Bugs.
Datum: Donnerstag, dem 19. November 2026 - Start 11:00 Uhr (MEZ) bis Samstag, dem 21. November 2026, - Ende circa 11:00 Uhr (MEZ)
Referenz-Ticket: MK-3725
Changelog: Upgraded Gardener from v1.151.4 to v1.152.3
Auswirkungen: Im Wartungszeitraum wird die API-Schnittstelle bis zu einer Minute nicht verfügbar sein.
Die nötigen Wartungsarbeiten dienen der Sicherheit, Aktualität und Performance unserer Infrastruktur. Wir sind bemüht sie schnellstmöglich und mit so wenigen Auswirkungen für Ihre Systeme wie möglich abzuschließen.
Haben Sie weitere Fragen zu diesem Vorgang, so stehen wir Ihnen über die Ihnen bekannten Kanäle zur Verfügung.
Vielen Dank für Ihr Verständnis.
Posted on Nov 12, 2026 - 11:36 CET
We would like to inform you about upcoming maintenance work in the Kubernetes environment. The work includes an upgrade to a newer product version to improve stability and fix various bugs.
Date: Thursday, November 19, 2026 -starting at 11:00 a.m. (CET) through Saturday, November 21, 2026 -ending around 11:00 a.m. (CET)
Reference Ticket: MK-3725
Changelog: Upgraded Gardener from v1.151.4 to v1.152.3
Impact: During the maintenance window, the API interface will be unavailable for up to one minute.
The necessary maintenance work is intended to ensure the security, up-to-date status, and performance of our infrastructure. We are committed to completing it as quickly as possible with minimal impact on your systems.
If you have any further questions regarding this process, please feel free to contact us through your usual channels.
Thank you for your understanding.
--
Sehr geehrte Kunden,
hiermit möchten wir Sie über anstehende Wartungsarbeiten in der Kubernetes Umgebung informieren. Die Arbeiten umfassen ein Upgrade auf eine neuere Produktversion zur Steigerung der Stabilität sowie Beseitigung diverser Bugs.
Datum: Donnerstag, dem 19. November 2026 - Start 11:00 Uhr (MEZ) bis Samstag, dem 21. November 2026, - Ende circa 11:00 Uhr (MEZ)
Referenz-Ticket: MK-3725
Changelog: Upgraded Gardener from v1.151.4 to v1.152.3
Auswirkungen: Im Wartungszeitraum wird die API-Schnittstelle bis zu einer Minute nicht verfügbar sein.
Die nötigen Wartungsarbeiten dienen der Sicherheit, Aktualität und Performance unserer Infrastruktur. Wir sind bemüht sie schnellstmöglich und mit so wenigen Auswirkungen für Ihre Systeme wie möglich abzuschließen.
Haben Sie weitere Fragen zu diesem Vorgang, so stehen wir Ihnen über die Ihnen bekannten Kanäle zur Verfügung.
Vielen Dank für Ihr Verständnis.
Posted on Nov 12, 2026 - 11:36 CET
Maintenance work on telephone system - Wartungsarbeiten Telefon-Anlage Nov 19, 2026 22:00-23:00 CET
Dear customers,
We would like to inform you that maintenance work will be carried out shortly in order to install the necessary software upgrades.
Date: Thursday, November 19, 2026
Time: 10:00 p.m. to 11:00 p.m. (CET)
Reference ticket: SUPT-6617
Impact: Impairments are not expected. We can of course still be contacted by ticket via the alternative route you are familiar with.
The necessary maintenance work serves the security, up-to-dateness and performance of our infrastructure. We will endeavor to complete them as quickly as possible and with as little impact on your systems as possible.
If you have any further questions, please do not hesitate to contact us via the channels known to you.
Yours sincerely
--
Sehr geehrte Kunden,
wir möchten Sie darüber informieren, dass in Kürze Wartungsarbeiten durchgeführt werden, um notwendige Software-Upgrades einzuspielen.
Datum: Donnerstag, dem 19. November 2026
Uhrzeit: 22:00 bis 23:00 Uhr (MEZ)
Referenz-Ticket: SUPT-6617
Auswirkungen: Beeinträchtigungen werden nicht erwartet. Selbstverständlich sind wir weiterhin per Ticket über den Ihnen bekannten Weg alternativ erreichbar.
Die nötigen Wartungsarbeiten dienen der Sicherheit, Aktualität und Performance unserer Infrastruktur. Wir sind bemüht sie schnellstmöglich und mit so wenigen Auswirkungen für Ihre Systeme wie möglich abzuschließen.
Haben Sie weitere Fragen hierzu, so stehen wir Ihnen über die Ihnen bekannten Kanäle gerne zur Verfügung.
Mit freundlichen Grüßen
Posted on Nov 10, 2026 - 07:52 CET
We would like to inform you that maintenance work will be carried out shortly in order to install the necessary software upgrades.
Date: Thursday, November 19, 2026
Time: 10:00 p.m. to 11:00 p.m. (CET)
Reference ticket: SUPT-6617
Impact: Impairments are not expected. We can of course still be contacted by ticket via the alternative route you are familiar with.
The necessary maintenance work serves the security, up-to-dateness and performance of our infrastructure. We will endeavor to complete them as quickly as possible and with as little impact on your systems as possible.
If you have any further questions, please do not hesitate to contact us via the channels known to you.
Yours sincerely
--
Sehr geehrte Kunden,
wir möchten Sie darüber informieren, dass in Kürze Wartungsarbeiten durchgeführt werden, um notwendige Software-Upgrades einzuspielen.
Datum: Donnerstag, dem 19. November 2026
Uhrzeit: 22:00 bis 23:00 Uhr (MEZ)
Referenz-Ticket: SUPT-6617
Auswirkungen: Beeinträchtigungen werden nicht erwartet. Selbstverständlich sind wir weiterhin per Ticket über den Ihnen bekannten Weg alternativ erreichbar.
Die nötigen Wartungsarbeiten dienen der Sicherheit, Aktualität und Performance unserer Infrastruktur. Wir sind bemüht sie schnellstmöglich und mit so wenigen Auswirkungen für Ihre Systeme wie möglich abzuschließen.
Haben Sie weitere Fragen hierzu, so stehen wir Ihnen über die Ihnen bekannten Kanäle gerne zur Verfügung.
Mit freundlichen Grüßen
Posted on Nov 10, 2026 - 07:52 CET
Replacement of UPS Systems - Austausch der USV-Anlagen Nov 23, 2026 08:00 - Dec 11, 2026 17:00 CET
Dear valued customers,
from November 23 to December 11, 2026, we will be replacing the UPS systems including batteries at our CGN DataCore data center in Cologne (DE-WEST-1).
These works are part of the continuous modernization of our infrastructure and ensure the long-term stability and resilience of your systems.
Schedule
The existing UPS units that are currently not in operation will be dismantled first. The new units will then be installed in the freed-up positions.
Throughout the works, we will maintain N+1 availability, ensuring your systems remain protected by a redundant power supply at all times.
Should unforeseen circumstances require us to temporarily dissolve the redundancy, we will keep these periods as short as possible.
During the switchovers between the UPS systems, the emergency power generator will be operated in parallel for additional protection.
If you have any questions, please do not hesitate to contact us.
Best regards,
Your Data Center Team
--
Sehr geehrte Kunden,
im Zeitraum vom 23. November bis 11. Dezember 2026 werden in unserem Rechenzentrum CGN DataCore in Köln (DE-WEST-1) die USV-Anlagen inklusive der Batterien ausgetauscht.
Die Arbeiten sind Teil der kontinuierlichen Modernisierung unserer Infrastruktur und dienen der langfristigen Stabilität und Ausfallsicherheit Ihrer Systeme.
Ablaufplanung
Zunächst werden die Bestandsanlagen abgebaut, die aktuell nicht in Betrieb sind. An den frei gewordenen Plätzen werden anschließend die neuen Anlagen installiert.
Während der gesamten Arbeiten gewährleisten wir weiterhin eine N+1-Verfügbarkeit – Ihre Systeme bleiben also durchgehend über eine redundante Stromversorgung abgesichert.
Sollte es durch unvorhersehbare Umstände erforderlich sein, die Redundanz kurzzeitig aufzulösen, halten wir diese Zeiträume so kurz wie möglich.
Während der Umschaltungen zwischen den USV-Systemen wird zur zusätzlichen Absicherung die Netzersatzanlage im Parallelbetrieb gefahren.
Bei Rückfragen stehen wir Ihnen gerne zur Verfügung.
Mit freundlichen Grüßen
Ihr Rechenzentrums-Team
Posted on Nov 09, 2026 - 15:06 CET
from November 23 to December 11, 2026, we will be replacing the UPS systems including batteries at our CGN DataCore data center in Cologne (DE-WEST-1).
These works are part of the continuous modernization of our infrastructure and ensure the long-term stability and resilience of your systems.
Schedule
The existing UPS units that are currently not in operation will be dismantled first. The new units will then be installed in the freed-up positions.
Throughout the works, we will maintain N+1 availability, ensuring your systems remain protected by a redundant power supply at all times.
Should unforeseen circumstances require us to temporarily dissolve the redundancy, we will keep these periods as short as possible.
During the switchovers between the UPS systems, the emergency power generator will be operated in parallel for additional protection.
If you have any questions, please do not hesitate to contact us.
Best regards,
Your Data Center Team
--
Sehr geehrte Kunden,
im Zeitraum vom 23. November bis 11. Dezember 2026 werden in unserem Rechenzentrum CGN DataCore in Köln (DE-WEST-1) die USV-Anlagen inklusive der Batterien ausgetauscht.
Die Arbeiten sind Teil der kontinuierlichen Modernisierung unserer Infrastruktur und dienen der langfristigen Stabilität und Ausfallsicherheit Ihrer Systeme.
Ablaufplanung
Zunächst werden die Bestandsanlagen abgebaut, die aktuell nicht in Betrieb sind. An den frei gewordenen Plätzen werden anschließend die neuen Anlagen installiert.
Während der gesamten Arbeiten gewährleisten wir weiterhin eine N+1-Verfügbarkeit – Ihre Systeme bleiben also durchgehend über eine redundante Stromversorgung abgesichert.
Sollte es durch unvorhersehbare Umstände erforderlich sein, die Redundanz kurzzeitig aufzulösen, halten wir diese Zeiträume so kurz wie möglich.
Während der Umschaltungen zwischen den USV-Systemen wird zur zusätzlichen Absicherung die Netzersatzanlage im Parallelbetrieb gefahren.
Bei Rückfragen stehen wir Ihnen gerne zur Verfügung.
Mit freundlichen Grüßen
Ihr Rechenzentrums-Team
Posted on Nov 09, 2026 - 15:06 CET
Migration of your plusbackup in pluscloud VMware / Notice of downtime on 24 Nov 2026 - Migration Ihres plusbackup in der pluscloud VMware / Hinweis auf Downtime am 24.11.2026 Nov 24, 2026 08:00-16:00 CET
Dear Customers,
we would like to inform you about a scheduled maintenance as part of the network migration of your plusbackup.
Maintenance window
Date: Tuesday, 24 November 2026
Time: 08:00 – 16:00 (CET)
Reason for the maintenance
We are relocating the plusbackup from pluscloud VMware region DE-4 [DE-WEST-2] to pluscloud VMware region DE-9 [DE-WEST-2] . As part of this, the network connection of the Veeam Cloud Connect will also be migrated.
Impact during the maintenance window
Please expect the following limitations during this period:
The Service Provider Console will be temporarily unavailable (downtime).
Backups and restores will be temporarily unavailable.
Backup Copy will be temporarily unavailable.
Notes
Please schedule any ongoing or planned backup and restore activities outside of the maintenance window where possible.
Your existing backups and restore points are not affected by the migration and will remain available.
Once the maintenance is complete, all functions will be available again as usual.
We appreciate your understanding and thank you for your patience.
Kind regards,
Your plusserver Team
--
Sehr geehrte Kunden,
wir möchten Sie über eine geplante Wartung im Rahmen der Netzwerk-Migration Ihres plusbackup informieren.
Wartungsfenster
Datum: Dienstag, der 24. November 2026
Zeitraum: 08:00 – 16:00 Uhr (MEZ)
Grund der Wartung
Wir verlagern das plusbackup von der pluscloud VMware Region DE-4 [DE-WEST-2] in die pluscloud VMware Region DE-9 [DE-WEST-2]. Im Zuge dessen wird auch die Netzwerk-Anbindung des Veeam Cloud Connect migriert.
Auswirkungen während des Wartungsfensters
Während dieses Zeitraums ist mit folgenden Einschränkungen zu rechnen:
Die Service Provider Konsole ist vorübergehend nicht erreichbar (Downtime).
Backup und Restore sind vorübergehend nicht möglich.
Backup Copy ist vorübergehend nicht möglich.
Hinweise
Bitte planen Sie laufende bzw. geplante Sicherungs- und Wiederherstellungsaktivitäten möglichst außerhalb des genannten Zeitfensters.
Ihre vorhandenen Backups und Restore-Punkte bleiben von der Migration unberührt und bestehen fort.
Nach Abschluss der Wartung stehen Ihnen alle Funktionen wieder wie gewohnt zur Verfügung.
Wir bitten um Ihr Verständnis und danken für Ihre Geduld.
Mit freundlichen Grüßen
Ihr plusserver-Team
Posted on Nov 09, 2026 - 15:13 CET
we would like to inform you about a scheduled maintenance as part of the network migration of your plusbackup.
Maintenance window
Date: Tuesday, 24 November 2026
Time: 08:00 – 16:00 (CET)
Reason for the maintenance
We are relocating the plusbackup from pluscloud VMware region DE-4 [DE-WEST-2] to pluscloud VMware region DE-9 [DE-WEST-2] . As part of this, the network connection of the Veeam Cloud Connect will also be migrated.
Impact during the maintenance window
Please expect the following limitations during this period:
The Service Provider Console will be temporarily unavailable (downtime).
Backups and restores will be temporarily unavailable.
Backup Copy will be temporarily unavailable.
Notes
Please schedule any ongoing or planned backup and restore activities outside of the maintenance window where possible.
Your existing backups and restore points are not affected by the migration and will remain available.
Once the maintenance is complete, all functions will be available again as usual.
We appreciate your understanding and thank you for your patience.
Kind regards,
Your plusserver Team
--
Sehr geehrte Kunden,
wir möchten Sie über eine geplante Wartung im Rahmen der Netzwerk-Migration Ihres plusbackup informieren.
Wartungsfenster
Datum: Dienstag, der 24. November 2026
Zeitraum: 08:00 – 16:00 Uhr (MEZ)
Grund der Wartung
Wir verlagern das plusbackup von der pluscloud VMware Region DE-4 [DE-WEST-2] in die pluscloud VMware Region DE-9 [DE-WEST-2]. Im Zuge dessen wird auch die Netzwerk-Anbindung des Veeam Cloud Connect migriert.
Auswirkungen während des Wartungsfensters
Während dieses Zeitraums ist mit folgenden Einschränkungen zu rechnen:
Die Service Provider Konsole ist vorübergehend nicht erreichbar (Downtime).
Backup und Restore sind vorübergehend nicht möglich.
Backup Copy ist vorübergehend nicht möglich.
Hinweise
Bitte planen Sie laufende bzw. geplante Sicherungs- und Wiederherstellungsaktivitäten möglichst außerhalb des genannten Zeitfensters.
Ihre vorhandenen Backups und Restore-Punkte bleiben von der Migration unberührt und bestehen fort.
Nach Abschluss der Wartung stehen Ihnen alle Funktionen wieder wie gewohnt zur Verfügung.
Wir bitten um Ihr Verständnis und danken für Ihre Geduld.
Mit freundlichen Grüßen
Ihr plusserver-Team
Posted on Nov 09, 2026 - 15:13 CET
Test run of emergency power supply systems and emergency air conditioning - Testlauf Netzersatzanlagen und Notfallklimatisierung Nov 24, 2026 09:00-15:00 CET
Dear customers,
We would like to inform you about the regular testing of emergency power systems and emergency air conditioning by plusserver technicians. Regular tests ensure that the systems are immediately ready for use in an emergency. In the event of power failures or other emergencies, these systems must function without delay.
Date: Tuesday, November 24, 2026
Time: 9:00 a.m. to 3:00 p.m. (CET)
Datacenter: CGN DataCore [DE-WEST-1]
Reference ticket: DCO-49473
Impact: During the specified time, a test run will take place for 30 minutes for the emergency power system and approximately 4 hours for the air conditioning system. This test is carried out under load on the connected infrastructure. An impairment of the power supply is not to be expected, but cannot be completely ruled out.
If you have any further questions, please do not hesitate to contact us via the channels known to you.
--
Sehr geehrte Kunden,
wir möchten Sie über den turnusmäßigen Test der Netzersatzanlagen sowie Notfallklimatisierung durch plusserver Techniker informieren. Regelmäßige Tests stellen sicher, dass die Anlagen im Notfall sofort einsatzbereit sind. Bei Stromausfällen oder anderen Notfällen müssen diese Systeme ohne Verzögerung funktionieren.
Datum: Dienstag, dem 24. November 2026
Uhrzeit: 09:00 bis 15:00 Uhr (MEZ)
Datacenter: CGN DataCore [DE-WEST-1]
Referenz-Ticket: DCO-49473
Auswirkungen: In der angegebenen Zeit wird für 30 Minuten ein Testlauf stattfinden für die Netzersatzanlage sowie circa 4 Stunden für die Klimatisierung. Dieser Test erfolgt unter Last der angeschlossenen Infrastruktur. Eine Beeinträchtigung der Energieversorgung ist nicht zu erwarten, kann aber nicht vollständig ausgeschlossen werden.
Haben Sie weitere Fragen hierzu, so stehen wir Ihnen über die Ihnen bekannten Kanäle gerne zur Verfügung.
Posted on Nov 16, 2026 - 15:51 CET
We would like to inform you about the regular testing of emergency power systems and emergency air conditioning by plusserver technicians. Regular tests ensure that the systems are immediately ready for use in an emergency. In the event of power failures or other emergencies, these systems must function without delay.
Date: Tuesday, November 24, 2026
Time: 9:00 a.m. to 3:00 p.m. (CET)
Datacenter: CGN DataCore [DE-WEST-1]
Reference ticket: DCO-49473
Impact: During the specified time, a test run will take place for 30 minutes for the emergency power system and approximately 4 hours for the air conditioning system. This test is carried out under load on the connected infrastructure. An impairment of the power supply is not to be expected, but cannot be completely ruled out.
If you have any further questions, please do not hesitate to contact us via the channels known to you.
--
Sehr geehrte Kunden,
wir möchten Sie über den turnusmäßigen Test der Netzersatzanlagen sowie Notfallklimatisierung durch plusserver Techniker informieren. Regelmäßige Tests stellen sicher, dass die Anlagen im Notfall sofort einsatzbereit sind. Bei Stromausfällen oder anderen Notfällen müssen diese Systeme ohne Verzögerung funktionieren.
Datum: Dienstag, dem 24. November 2026
Uhrzeit: 09:00 bis 15:00 Uhr (MEZ)
Datacenter: CGN DataCore [DE-WEST-1]
Referenz-Ticket: DCO-49473
Auswirkungen: In der angegebenen Zeit wird für 30 Minuten ein Testlauf stattfinden für die Netzersatzanlage sowie circa 4 Stunden für die Klimatisierung. Dieser Test erfolgt unter Last der angeschlossenen Infrastruktur. Eine Beeinträchtigung der Energieversorgung ist nicht zu erwarten, kann aber nicht vollständig ausgeschlossen werden.
Haben Sie weitere Fragen hierzu, so stehen wir Ihnen über die Ihnen bekannten Kanäle gerne zur Verfügung.
Posted on Nov 16, 2026 - 15:51 CET
Update VMware Cloud Director - pluscloud VMware Region Nov 24, 2026 10:00 - Nov 26, 2026 17:00 CET
Dear Customers,
we would like to inform you about a necessary update for the VMware Cloud Director in the pluscloud VMware regions. The maintenance work will be carried out as follows:
pluscloud VMware Region DE-5 [DE-NORTH-1]
24 November 2026
Tuesday
10:00 – 12:00
pluscloud VMware Region DE-6 [DE-NORTH-2]
24 November 2026
Tuesday
14:00 – 16:00
pluscloud VMware Region DE-7 [DE-WEST-1]
25 November 2026
Wednesday
10:00 – 12:00
pluscloud VMware Region DE-9 [DE-WEST-2]
25 November 2026
Wednesday
14:00 – 16:00
pluscloud VMware Region DE-11 [DE-WEST-1]
26 November 2026
Thursday
10:00 – 17:00
All times are in CET.
Reference ticket: GCL-5650
Impact: During this time, the web interface of the respective region will not be available. Therefore, no configuration work can be carried out in the GUI during the respective maintenance window. There will be no impact on the operation of your VMs.
The required maintenance work serves the security, currency, and performance of our infrastructure. We will make every effort to complete it as quickly as possible and with as little impact on your systems as possible.
If you have any further questions, please do not hesitate to contact us through the channels you are familiar with.
Best regards
--
Sehr geehrte Kunden,
hiermit möchten wir Sie über ein notwendiges Update für den VMware Cloud Director in den pluscloud VMware Regionen informieren. Die Wartungsarbeiten werden wie folgt durchgeführt:
pluscloud VMware Region DE-5 [DE-NORTH-1]
24. November 2026
Dienstag
10:00 – 12:00 Uhr
pluscloud VMware Region DE-6 [DE-NORTH-2]
24. November 2026
Dienstag
14:00 – 16:00 Uhr
pluscloud VMware Region DE-7 [DE-WEST-1]
25. November 2026
Mittwoch
10:00 – 12:00 Uhr
pluscloud VMware Region DE-9 [DE-WEST-2]
25. November 2026
Mittwoch
14:00 – 16:00 Uhr
pluscloud VMware Region DE-11 [DE-WEST-1]
26. November 2026
Donnerstag
10:00 – 17:00 Uhr
Alle Zeitangaben in MEZ.
Referenz-Ticket: GCL-5650
Auswirkungen: In dieser Zeit wird das Webinterface der jeweiligen Region nicht erreichbar sein. Daher können innerhalb des jeweiligen Wartungszeitraumes keine Konfigurationsarbeiten in der GUI durchgeführt werden. Es hat keinen Einfluss auf den laufenden Betrieb Ihrer VMs.
Die nötigen Wartungsarbeiten dienen der Sicherheit, Aktualität und Performance unserer Infrastruktur. Wir sind bemüht, sie schnellstmöglich und mit so wenigen Auswirkungen für Ihre Systeme wie möglich abzuschließen.
Haben Sie weitere Fragen hierzu, so stehen wir Ihnen über die Ihnen bekannten Kanäle gerne zur Verfügung.
Mit freundlichen Grüßen
Posted on Nov 17, 2026 - 14:16 CET
we would like to inform you about a necessary update for the VMware Cloud Director in the pluscloud VMware regions. The maintenance work will be carried out as follows:
pluscloud VMware Region DE-5 [DE-NORTH-1]
24 November 2026
Tuesday
10:00 – 12:00
pluscloud VMware Region DE-6 [DE-NORTH-2]
24 November 2026
Tuesday
14:00 – 16:00
pluscloud VMware Region DE-7 [DE-WEST-1]
25 November 2026
Wednesday
10:00 – 12:00
pluscloud VMware Region DE-9 [DE-WEST-2]
25 November 2026
Wednesday
14:00 – 16:00
pluscloud VMware Region DE-11 [DE-WEST-1]
26 November 2026
Thursday
10:00 – 17:00
All times are in CET.
Reference ticket: GCL-5650
Impact: During this time, the web interface of the respective region will not be available. Therefore, no configuration work can be carried out in the GUI during the respective maintenance window. There will be no impact on the operation of your VMs.
The required maintenance work serves the security, currency, and performance of our infrastructure. We will make every effort to complete it as quickly as possible and with as little impact on your systems as possible.
If you have any further questions, please do not hesitate to contact us through the channels you are familiar with.
Best regards
--
Sehr geehrte Kunden,
hiermit möchten wir Sie über ein notwendiges Update für den VMware Cloud Director in den pluscloud VMware Regionen informieren. Die Wartungsarbeiten werden wie folgt durchgeführt:
pluscloud VMware Region DE-5 [DE-NORTH-1]
24. November 2026
Dienstag
10:00 – 12:00 Uhr
pluscloud VMware Region DE-6 [DE-NORTH-2]
24. November 2026
Dienstag
14:00 – 16:00 Uhr
pluscloud VMware Region DE-7 [DE-WEST-1]
25. November 2026
Mittwoch
10:00 – 12:00 Uhr
pluscloud VMware Region DE-9 [DE-WEST-2]
25. November 2026
Mittwoch
14:00 – 16:00 Uhr
pluscloud VMware Region DE-11 [DE-WEST-1]
26. November 2026
Donnerstag
10:00 – 17:00 Uhr
Alle Zeitangaben in MEZ.
Referenz-Ticket: GCL-5650
Auswirkungen: In dieser Zeit wird das Webinterface der jeweiligen Region nicht erreichbar sein. Daher können innerhalb des jeweiligen Wartungszeitraumes keine Konfigurationsarbeiten in der GUI durchgeführt werden. Es hat keinen Einfluss auf den laufenden Betrieb Ihrer VMs.
Die nötigen Wartungsarbeiten dienen der Sicherheit, Aktualität und Performance unserer Infrastruktur. Wir sind bemüht, sie schnellstmöglich und mit so wenigen Auswirkungen für Ihre Systeme wie möglich abzuschließen.
Haben Sie weitere Fragen hierzu, so stehen wir Ihnen über die Ihnen bekannten Kanäle gerne zur Verfügung.
Mit freundlichen Grüßen
Posted on Nov 17, 2026 - 14:16 CET
Scheduled maintenance - Wartungsankündigung Nov 25, 2026 18:00-19:00 CET
Dear Customers,
On Wednesday, November 25, 2026, we will be performing a brief maintenance on our central login services between 6:00 p.m. and 7:00 p.m. (CET).
What is affected?
During this time, login access may be temporarily limited or unavailable. The following services are specifically affected:
CloudHub (customer portal)
Logins to various Kubernetes interfaces / tools
What does this mean for you?
During maintenance, the affected services will be unavailable for a short time. Please plan accordingly, as logins may not be possible during this time window.
We appreciate your understanding and thank you for your patience.
Best regards,
Your plusserver Team
--
Sehr geehrte Kunden,
am Mittwoch, dem 25. November 2026 führen wir zwischen 18:00 und 19:00 Uhr (MEZ) eine kurze Wartung an unseren zentralen Anmeldungsdiensten durch.
Was ist betroffen?
In diesem Zeitraum kann die Anmeldung kurzzeitig eingeschränkt sein oder vorübergehend nicht funktionieren. Betroffen sind insbesondere:
CloudHub (Kundenportal)
Anmeldungen zu verschiedenen Kubernetes-Interfaces / Tools
Was bedeutet das für Sie?
Während der Wartung werden die betroffenen Dienste für kurze Zeit nicht erreichbar sein. Bitte planen Sie ein, dass Logins in diesem Zeitfenster unter Umständen nicht möglich sind.
Wir bitten um Ihr Verständnis und danken Ihnen für Ihre Geduld.
Mit freundlichen Grüßen
Ihr plusserver-Team
Posted on Nov 09, 2026 - 14:57 CET
On Wednesday, November 25, 2026, we will be performing a brief maintenance on our central login services between 6:00 p.m. and 7:00 p.m. (CET).
What is affected?
During this time, login access may be temporarily limited or unavailable. The following services are specifically affected:
CloudHub (customer portal)
Logins to various Kubernetes interfaces / tools
What does this mean for you?
During maintenance, the affected services will be unavailable for a short time. Please plan accordingly, as logins may not be possible during this time window.
We appreciate your understanding and thank you for your patience.
Best regards,
Your plusserver Team
--
Sehr geehrte Kunden,
am Mittwoch, dem 25. November 2026 führen wir zwischen 18:00 und 19:00 Uhr (MEZ) eine kurze Wartung an unseren zentralen Anmeldungsdiensten durch.
Was ist betroffen?
In diesem Zeitraum kann die Anmeldung kurzzeitig eingeschränkt sein oder vorübergehend nicht funktionieren. Betroffen sind insbesondere:
CloudHub (Kundenportal)
Anmeldungen zu verschiedenen Kubernetes-Interfaces / Tools
Was bedeutet das für Sie?
Während der Wartung werden die betroffenen Dienste für kurze Zeit nicht erreichbar sein. Bitte planen Sie ein, dass Logins in diesem Zeitfenster unter Umständen nicht möglich sind.
Wir bitten um Ihr Verständnis und danken Ihnen für Ihre Geduld.
Mit freundlichen Grüßen
Ihr plusserver-Team
Posted on Nov 09, 2026 - 14:57 CET
Updates Internal Tools - Updates interne Tools Nov 25, 2026 18:00-20:00 CET
Dear Valued Customer,
As part of ongoing updates, we will be maintaining and upgrading several of our internal backend systems. This is purely maintenance work to ensure the long-term stability of our infrastructure.
Reference: CIT-7969
When: Wednesday, November 25, 2026 | 18:00 to 20:00 CET
What does this mean for you?
During the maintenance window from 18:00 to 20:00 CET, the Customer Portal (Cloud Portal) will be temporarily limited in the Domain Management section. You may not be able to order or manage domains via the portal during this time frame.
We apologize for any temporary inconvenience and thank you for your understanding.
Best regards,
--
Sehr geehrter Kunde,
im Rahmen laufender Updates werden mehrere unserer internen Backend-Systeme gewartet und aktualisiert. Dabei handelt es sich um reine Wartungsarbeiten um die langfristige Stabilität unserer Infrastruktur sicherstellen.
Referenz: CIT-7969
Wann: Mittwoch, 25.11.2026 | 18:00 bis 20:00 Uhr
Was bedeutet das für Sie?
Während der Wartung von 18:00 bis 20:00 Uhr ist das Kundenportal (Cloud Portal) im Bereich Domain-Management vorübergehend eingeschränkt. Es kann sein, dass Sie Domains während dieses Zeitfensters nicht über das Portal bestellen oder verwalten können.
Wir entschuldigen uns für die vorübergehende Unbequemlichkeit und danken Ihnen für Ihr Verständnis.
Mit freundlichen Grüßen
Posted on Nov 10, 2026 - 10:18 CET
As part of ongoing updates, we will be maintaining and upgrading several of our internal backend systems. This is purely maintenance work to ensure the long-term stability of our infrastructure.
Reference: CIT-7969
When: Wednesday, November 25, 2026 | 18:00 to 20:00 CET
What does this mean for you?
During the maintenance window from 18:00 to 20:00 CET, the Customer Portal (Cloud Portal) will be temporarily limited in the Domain Management section. You may not be able to order or manage domains via the portal during this time frame.
We apologize for any temporary inconvenience and thank you for your understanding.
Best regards,
--
Sehr geehrter Kunde,
im Rahmen laufender Updates werden mehrere unserer internen Backend-Systeme gewartet und aktualisiert. Dabei handelt es sich um reine Wartungsarbeiten um die langfristige Stabilität unserer Infrastruktur sicherstellen.
Referenz: CIT-7969
Wann: Mittwoch, 25.11.2026 | 18:00 bis 20:00 Uhr
Was bedeutet das für Sie?
Während der Wartung von 18:00 bis 20:00 Uhr ist das Kundenportal (Cloud Portal) im Bereich Domain-Management vorübergehend eingeschränkt. Es kann sein, dass Sie Domains während dieses Zeitfensters nicht über das Portal bestellen oder verwalten können.
Wir entschuldigen uns für die vorübergehende Unbequemlichkeit und danken Ihnen für Ihr Verständnis.
Mit freundlichen Grüßen
Posted on Nov 10, 2026 - 10:18 CET
Scheduled maintenance network infrastructure. - Wartungsarbeiten Netzwerkinfrastruktur Dec 1, 2026 07:00-08:00 CET
Dear Customers,
On Tuesday, December 1, 2026, between 07:00 and 08:00 (MEZ), we will be performing scheduled maintenance on our network infrastructure.
Please be aware that this may result in brief connection interruptions lasting a few seconds.
📅 When: December 1, 2026 – 07:00 to 08:00 (MEZ)
⚠️ Impact: Brief, temporary connection interruptions possible
Reference: NET-5294
Our redundant systems will automatically take over – an extended outage is not expected.
This maintenance is a vital part of our commitment to keeping your network infrastructure future-proof, high-performance, and secure – and to providing you with outstanding service on an ongoing basis.
We have taken all necessary precautions to ensure the maintenance proceeds as smoothly and seamlessly as possible for you.
Our support team is, of course, available at any time should you have any questions or concerns.
Thank you for your trust and cooperation regarding this maintenance work.
--
Sehr geehrte Kunden,
am Dienstag, dem 1. Dezember 2026 in der Zeit von 07:00 bis 08:00 Uhr (MEZ) führen wir geplante Wartungsarbeiten an unserer Netzwerkinfrastruktur durch.
Bitte beachten Sie, dass es dabei zu kurzen Verbindungsunterbrechungen von wenigen Sekunden kommen kann.
📅 Wann: 1. Dezember 2026 – 07:00 bis 08:00 Uhr (MEZ)
⚠️ Auswirkungen: Kurze, temporäre Verbindungsunterbrechungen möglich
Referenz: NET-5294
Unsere redundanten Systeme übernehmen automatisch – ein längerer Ausfall ist nicht zu erwarten.
Diese Wartung ist ein wesentlicher Bestandteil unseres Engagements, Ihre Netzwerkinfrastruktur zukunftssicher, leistungsstark und sicher zu gestalten – und Ihnen dauerhaft erstklassigen Service zu bieten.
Wir haben alle Maßnahmen ergriffen, damit die Wartungsarbeiten für Sie möglichst unkompliziert und störungsfrei verlaufen.
Unser Support-Team steht Ihnen selbstverständlich jederzeit für Fragen oder Anliegen zur Verfügung.
Vielen Dank für Ihr Vertrauen und Ihre Kooperation im Rahmen dieser Wartungsarbeiten.
Posted on Nov 10, 2026 - 09:37 CET
On Tuesday, December 1, 2026, between 07:00 and 08:00 (MEZ), we will be performing scheduled maintenance on our network infrastructure.
Please be aware that this may result in brief connection interruptions lasting a few seconds.
📅 When: December 1, 2026 – 07:00 to 08:00 (MEZ)
⚠️ Impact: Brief, temporary connection interruptions possible
Reference: NET-5294
Our redundant systems will automatically take over – an extended outage is not expected.
This maintenance is a vital part of our commitment to keeping your network infrastructure future-proof, high-performance, and secure – and to providing you with outstanding service on an ongoing basis.
We have taken all necessary precautions to ensure the maintenance proceeds as smoothly and seamlessly as possible for you.
Our support team is, of course, available at any time should you have any questions or concerns.
Thank you for your trust and cooperation regarding this maintenance work.
--
Sehr geehrte Kunden,
am Dienstag, dem 1. Dezember 2026 in der Zeit von 07:00 bis 08:00 Uhr (MEZ) führen wir geplante Wartungsarbeiten an unserer Netzwerkinfrastruktur durch.
Bitte beachten Sie, dass es dabei zu kurzen Verbindungsunterbrechungen von wenigen Sekunden kommen kann.
📅 Wann: 1. Dezember 2026 – 07:00 bis 08:00 Uhr (MEZ)
⚠️ Auswirkungen: Kurze, temporäre Verbindungsunterbrechungen möglich
Referenz: NET-5294
Unsere redundanten Systeme übernehmen automatisch – ein längerer Ausfall ist nicht zu erwarten.
Diese Wartung ist ein wesentlicher Bestandteil unseres Engagements, Ihre Netzwerkinfrastruktur zukunftssicher, leistungsstark und sicher zu gestalten – und Ihnen dauerhaft erstklassigen Service zu bieten.
Wir haben alle Maßnahmen ergriffen, damit die Wartungsarbeiten für Sie möglichst unkompliziert und störungsfrei verlaufen.
Unser Support-Team steht Ihnen selbstverständlich jederzeit für Fragen oder Anliegen zur Verfügung.
Vielen Dank für Ihr Vertrauen und Ihre Kooperation im Rahmen dieser Wartungsarbeiten.
Posted on Nov 10, 2026 - 09:37 CET
Scheduled Maintenance on the Ticket System - Geplante Wartungsarbeiten am Ticketsystem (CloudHub) Dec 1, 2026 13:00-17:00 CET
Dear Customers,
On Tuesday, December 1, 2026, from 1:00 p.m. to 5:00 p.m., we will be performing scheduled maintenance on our ticket system (Jira) in the CloudHub customer portal.
What does this mean for you?
During the maintenance window, the ticket system will be available in read-only mode: No new tickets can be created during this time. Existing tickets can still be viewed. For urgent matters, you can reach us by phone during this time; our staff will be happy to assist you.
Why are we performing this maintenance?
We are modernizing and updating the underlying system infrastructure to ensure the stability, security, and performance of our ticket system well into the future.
After Maintenance
We expect all functions to be available as usual once the work is complete. We will inform you here immediately of any delays.
We appreciate your understanding and thank you for your patience.
--
Sehr geehrte Kunden,
am Dienstag, den 01.12.2026, in der Zeit von 13:00 bis 17:00 Uhr führen wir geplante Wartungsarbeiten an unserem Ticketsystem (Jira) im Kundenportal CloudHub durch.
Was bedeutet das für Sie?
Während des Wartungsfensters ist das Ticketsystem nur im Lesemodus verfügbar: Es können in diesem Zeitraum keine neuen Tickets angelegt werden. Bereits vorhandene Tickets können weiterhin eingesehen werden. Für dringende Anliegen erreichen Sie uns in dieser Zeit telefonisch , unsere Mitarbeiter sind gerne für Sie da.
Warum führen wir die Wartung durch?
Wir modernisieren und aktualisieren die zugrunde liegende Systeminfrastruktur, um die Stabilität, Sicherheit und Leistungsfähigkeit unseres Ticketsystems auch in Zukunft zu gewährleisten.
Nach der Wartung
Wir gehen davon aus, dass alle Funktionen nach Abschluss der Arbeiten wieder wie gewohnt zur Verfügung stehen. Über eventuelle Verzögerungen informieren wir Sie an dieser Stelle umgehend.
Wir bitten um Ihr Verständnis und danken Ihnen für Ihre Geduld.
Posted on Nov 16, 2026 - 14:37 CET
On Tuesday, December 1, 2026, from 1:00 p.m. to 5:00 p.m., we will be performing scheduled maintenance on our ticket system (Jira) in the CloudHub customer portal.
What does this mean for you?
During the maintenance window, the ticket system will be available in read-only mode: No new tickets can be created during this time. Existing tickets can still be viewed. For urgent matters, you can reach us by phone during this time; our staff will be happy to assist you.
Why are we performing this maintenance?
We are modernizing and updating the underlying system infrastructure to ensure the stability, security, and performance of our ticket system well into the future.
After Maintenance
We expect all functions to be available as usual once the work is complete. We will inform you here immediately of any delays.
We appreciate your understanding and thank you for your patience.
--
Sehr geehrte Kunden,
am Dienstag, den 01.12.2026, in der Zeit von 13:00 bis 17:00 Uhr führen wir geplante Wartungsarbeiten an unserem Ticketsystem (Jira) im Kundenportal CloudHub durch.
Was bedeutet das für Sie?
Während des Wartungsfensters ist das Ticketsystem nur im Lesemodus verfügbar: Es können in diesem Zeitraum keine neuen Tickets angelegt werden. Bereits vorhandene Tickets können weiterhin eingesehen werden. Für dringende Anliegen erreichen Sie uns in dieser Zeit telefonisch , unsere Mitarbeiter sind gerne für Sie da.
Warum führen wir die Wartung durch?
Wir modernisieren und aktualisieren die zugrunde liegende Systeminfrastruktur, um die Stabilität, Sicherheit und Leistungsfähigkeit unseres Ticketsystems auch in Zukunft zu gewährleisten.
Nach der Wartung
Wir gehen davon aus, dass alle Funktionen nach Abschluss der Arbeiten wieder wie gewohnt zur Verfügung stehen. Über eventuelle Verzögerungen informieren wir Sie an dieser Stelle umgehend.
Wir bitten um Ihr Verständnis und danken Ihnen für Ihre Geduld.
Posted on Nov 16, 2026 - 14:37 CET
