Digital Realty Engineers will be performing a Generator Control System Maintenance during the dates/times shown below on generators 1-4. Building loads will remain supported by the generator system. The maintenance work will be carried out one generator at a time. Once 2 generators are done they will be connected to a new main control unit to support the building in case of an power outage. Generator 3 and 4 will be moved to the new unit after it is tested and commissioned. One generator is sufficient enough to cover the actual building load. So during the works the redundancy will remain with N+1 all the time. We do not expect any impact to our customer.
Maintenance TST# 00806203 Location: (Lyoner Strasse, Frankfurt) Floor(s) / Suite(s): All Maintenance Type: Planned Maintenance Priority: YELLOW Event - PSA (Potentially Service Affecting) Product(s)/Asset(s) Affected: Generator Description: Generator Control System Renewal Local Start Date/Time: 2022-10-04 07:00 AM Local End Date/Time: 2022-11-17 06:00 PM Duration: 11 Hours Daily
Posted Sep 23, 2022 - 08:42 CEST
This scheduled maintenance affected: Sites (FRA4) and Services (Power).