DUS4 Scheduled Generator Load Transfer Feed 1 // DUS4 regelmäßiger Generatorentest
Scheduled Maintenance Report for plusserver
Completed
The scheduled maintenance has been completed.
Posted May 09, 2022 - 19:34 CEST
Scheduled
Herewith we would like to inform you about the maintenance works of the DC operator Equinix in DUS4 (Albertstr. in Düsseldorf).

Implementation date:

Monday, April 11 2022 between 08:00 to 18:00 (CEST) .

During this time, Equinix are going to perform a scheduled generator load transfer test. Power feeds to customer cabinets will remain protected by our Uninterruptible Power Systems (UPS) at all times. We do not expect any impairment of the power supply, but we cannot completely rule this out.

If you have any further questions about this, please do not hesitate to contact us through the channels you are familiar with. Reference ticket: DCO-7179

--

hiermit möchten wir Sie über die Wartungsarbeiten des DC-Betreiber Equinix in DUS4 (Albertstr. in Düsseldorf) in Kenntnis setzen.

Durchführungstermin:

Montag, dem 11. April 2022 in der Zeit zwischen 08:00 bis 18:00 Uhr (MESZ)

In dieser Zeit wird durch Equinix ein geplanter Generatorlastübertragungstest durchgeführt.
Stromversorgungen zu Kundencabinets bleiben jederzeit durch die unterbrechungsfreien Stromversorgungssysteme (USV) geschützt. Wir erwarten keine Beeinträchtigung der Stromversorgung, können dies jedoch nicht vollständig ausschließen.

Haben Sie weitere Fragen hierzu, so stehen wir Ihnen über die Ihnen bekannten Kanäle gerne zur Verfügung. Referenzticket: DCO-7179
Posted Apr 08, 2022 - 11:57 CEST
This scheduled maintenance affected: Sites (DUS4) and Services (Power).